England |
|
|
|
Barningham |
B. High Moor 91/SE0797 |
25x600kW Famous PI test case dismissed at High Court |
08 |
Debden Farm |
3km N Rothbury 81/NU0504 |
10MW IC N4 project. Ecogen. Application dropped
|
08 |
Humble Hill |
Kielder Forest |
TRIGen 27x300kW. Withdrawn MOD obj. see 08-07 below |
08 |
Humble Hill |
Padderburn Moor, Kielder ForestT80/NY8481 |
82MW @ 107M high. N5 Application refusedMOD objection re low-flying aircraft upheld at Judicial Review 2002 |
08 |
Inkerman |
Tow Law, 92/NZ1139 |
Planning for IC 4MW 1994 but no funds. See List A |
08 |
Rimside Moor |
Nr Rothbury, edge of Northumberland National Park |
3 turbines. Rejected after planning rejection/appeal/PI. Significant result – it is on grounds of landscape, and not in a designated area |
08 |
Barkin House |
Between Kendal and K. Lonsdale 97/SD5885 |
6MW IC N4 Application refused (Plan. Cttee) |
09 |
Brocklebank |
B. Hill Top |
18x600kW rejected after Inquiry |
09 |
Brocklebank II |
(as above) |
17x500kW new attempt also rejected after PI 2000 |
09 |
Drigg |
Seascale 89/SD0598 |
Planning refused 1997, refused at PI 1998 |
09 |
Firbank |
Kendal |
8x600kW refused at planning and PI |
09 |
Gunson Height |
Kirkby Moor |
16x500kW. refused at PI 1998 |
09 |
Low Row |
Brampton, Cumbria Cumbria |
Withdrawn after MOD objections |
09 |
Lowick Beacon |
Ulverston 96/SD/2884 |
3x400kW. Refused on appeal 1997. See List A for new attempt |
09 |
Lowick Beacon II |
Nr Ulverston. 96/SD2884 |
Rerun3 x 600fW turbines. Rejected at PI |
09 |
Pica |
Whitehaven |
IWP gave up after 2 submissions, PI and High Court ruling |
09 |
Silloth |
Solway Firth |
25 turbines withdrawn |
09 |
Workington |
Cumbrian Coast |
1994.Planning for 24 turbines but no funds. See List C |
09 |
Eastfield Farm |
Hollyn TA3424 |
13x1.0MW Refused at PI 2000 |
10 |
Kexgill |
Ilkley, 104/SE1125 |
18x500kW proposal - time expired |
10 |
OutStray Farm |
Sunk Island, on Humber estuary.107/TA2619 |
3 x 600kW. N4. Withdrawn at application stage |
10 |
Roos |
E Yorkshire |
26 x 2MW Application withdrawn by NWP after local opposition |
10 |
Sober Hill |
Mkt Weighton 106/SE9338 |
1996 Planning refused for 6x250kW |
10 |
Vicar's Allotment |
Skipton 103/SE0252 |
22x500kW project abandoned |
10 |
Addingham |
Ilkley |
Project withdrawn 1992 |
11 |
Barn Hill Farm |
Halifax |
Single 250kW turbine plan withdrawn - owner died |
11 |
Century Steel |
Company works -Penistone |
10x200kW turbines refused by Barnsley Council and PI |
11 |
Cliviger |
Extension to List C Cliviger |
Withdrawn - no NFFO. Tried again - see List A 11-38 |
11 |
Coal Clough Ext. |
Burnley SD8928 |
3x1.0MW. Withdrawn. |
11 |
Craven |
Airdale |
8 turbines refused planning |
11 |
Crow Edge |
Penistone |
7x500kW turbines turned down by Sheffield Co. and PI |
11 |
Cuckoo Pk Quarry |
Keighley 103/SE0241 |
2 turbines refused at PI |
11 |
Cullingworth |
Nr Haworth |
5x400kW. Proposed Alternative Energy Centre failed |
11 |
Darwen Moor |
White Hill, 6km S Backburn. 103/SO6821 |
12 MW @ 75M. N4 Planning Refused Feb 2003 |
11 |
Denholme |
Oxenhope 103/SE0733 |
Yorks Wind Power withdrew |
11 |
Dry Hill |
Huddersfield |
Withdrawn 1994. Probably a single 400kW turbine |
11 |
East Morton |
Keighley |
8x400kW turbines refused locally and at PI |
11 |
Eastburn |
Airdale 103/SE0345 |
8 turbines . Withdrawn - cost of preparing EIA |
11 |
Flaight Hill |
Haworth 103/SE0337 |
NWP 44x550kW in Bronte country. Refused after model campaign |
11 |
Great Hill |
Littleborough, nr Rochdale.109/SD9216 |
13 x . Planning refused. No PI |
11 |
Holmfirth |
Penistone 110/SE1608 |
10x400kW turbines turned down after PI |
11 |
Moorside Farm |
Haworth |
4x400 turbines refused both locally and on Inquiry |
11 |
Naylor Hill |
Keighley |
2 turbines refused locally and at PI |
11 |
Riddlesden |
Keighley |
3 turbines refused, no appeal |
11 |
Coalville |
Leics. Loughborough Coll. |
1x300kW and 1x 15kW. Planning refused |
13 |
Orby, Lincs |
Nr Skegness |
20 x 1.5 MW 30MW IC. Refused after PI. |
13 |
Black Hill |
Herefordshire 161/SO3741 |
SSSI bordering Offa's Dyke. Plan for 15x500kW abandoned |
14 |
Vigar Hill |
Golden Valley, Hereford & Worcester |
Withdrawn after massive opposition. “Uneconomic” According to Force 9 Wind |
14 |
Windmill Hill |
nr Stroud ,Glos. |
Developer D Vince withdrew just before date of PI. |
14 |
Brundish |
Sth Norfolk |
1 x 1.5MW, time-expired for appeal after planning refused |
16 |
Chosley, Docking |
West Norfolk, inland from Hunstanton NWP |
3 x 1.3MW 2004 Application withdrawn after local pressure. |
16 |
Coldham |
Nr March, Cambs |
2 x 1.75. Withdrawn - NFFO contract transferred to Stags Holt |
16 |
Honey Hill |
Nr March, Cambs. |
3 x 1.75. Withdrawn - NFFO contract transferred to Stags Holt |
16 |
Ingham Farms |
Stalham 134/TG3925 |
7x600kW plan abandoned - no NFFO contract |
16 |
Mendlesham, Suffolk
|
E of the A140, NE of Stowmarket Mis Suffolk Tradelink Solutions |
Application withdrawn by landowner |
16 |
Metfield Airfield |
St James, near Bungay, on the Suffolk/Norfolk border |
Application made then withdrawn after opposition from Villagers Against Inappropriate Turbine Sitings |
16 |
Pond Farm |
Bodham, Holt, Norfolk |
1995. 15x500kW turbines refused locally and by Inquiry |
16 |
Reydon |
Southwold 156/SO78 |
Withdrawn at an early stage. |
16 |
Sears, Cambs. |
Nr March |
3 x 1.75. Withdrawn - NFFO contract transferred to Stags Holt |
16 |
Sedgeford, Norfolk |
SE of Hunstanton Ecotricity |
6 x Enercon66, 100M high. Withdrawn after opposition from SOS group, also local bird groups. |
16 |
Shipdham, Norfolk |
On edge of of villages Shipdham & Bradenham |
2 x @ 400f hight. Reject by Planning Cttee Dec 2002. www.shipdhamturbines.co.uk |
16 |
Stockton |
1.5kM Sth Norwich |
1 x 1.5MW. Time-expired for appeal after planning refused |
16 |
West Beckham |
Holt, Norfolk |
1995. 4x600kW turbines refused after PI |
16 |
Five Beeches |
Brixton Deverill, Wilts |
6x200kW refused locally and by PI. Ref List A 17-03 |
17 |
Shoreham |
Harbour , Hove |
15-turbine plan refused locally (twice)and at Inquiry |
19 |
Sidlesham |
Chichester 198/SZ8998 |
10-turbine plan refused locally and at Inquiry |
19 |
Ashwater, Cornwall |
Nt of Launceston NWP |
3 x 1.3 Windworks scheme. Withdrawn 2004 |
20 |
Bradbury |
Devon |
App for 3 turbines by West Coast Energy was rejected |
20 |
Broadwoodwidger |
Nr Holsworthy, Devon |
3 x @ 300ft High |
20 |
Butteriss Gate |
Helston 203/SW33 |
12x300kW - time expired |
20 |
Caer Bran |
St Just 203/SW33 |
See 20-26 |
20 |
Caradon |
Bodmin Moor 201/SX2672 |
15 turbines refused in 1993 |
20 |
Cold Northcott |
St Clether |
An extension to List C project of same name. Appeal withdrawn |
20 |
Crimp |
Kilkhampton |
Time expired. But Ref List A 20-45 |
20 |
Cucklington, Somerset |
Symphony Farm, near Wincanton Ecotricity |
2 x 100M high. Application rejected 2004 by S Somerset DC. www.savethevale.org.uk |
20 |
Fraddam |
St Ives |
Project withdrawn before submission. |
20 |
Fullabrook B'ton |
N Devon |
24x300kW. Ref. at PI, dimissed High Court 1994 |
20 |
Hailglower |
St Just, Cornwall |
With Lifton and Tregerest , Wind Harvester withdrew 1994 |
20 |
Lamerton, Devon |
Beech Farm, Tavistock
NWP |
2 x 1.3MW. Sept 2004 rejected unanimously at Planning on Landscape grounds. Windfarm Lamerton Action Group. foghanger@hotmail.com |
20 |
Lancarrow |
Redruth 204/SW6938 |
Time-expired |
20 |
Lifton |
Launceston 201/SX3886 |
8x500kW - time expired |
20 |
Meddon |
Hartland Point |
EcoGen refused planning |
20 |
Otterham |
Rose Pk Farm, Boscastle |
11-turbine plan withdrawn in 1993. |
20 |
Otterham, Cornwall |
Rose Park Farm, 7km E Boscastle190/SX1790 |
5 x 800 kW. N4 Rejected 17-9 at full council 2002 |
20 |
Pelynt |
Looe 201/SX1953 |
|